ISOBUS Task Controller (ISO TC)

The next evolution from TUVR:

  • An Isobus implement can be connected to either an Intelliview IV, XCN-1050 or XCN-2050 display, showing both the implement operating screen and controlling rate / section at the same time via GPS
  • Often just a simple one-plug connection is required between the implement and tractor / XCN display
  • Implement operation is shown on the display UT (Universal Terminal)
  • Commands for rate and section control are sent to the implement ECU from the Intelliview IV or XCN display

24909738 1977774285794156 3061282115371280892 n

24131124 1972536862984565 2136834671573223823 n

Go To Top